Encore supports investors and PV operators during the preliminary analysis, feasibility and development phases of solar PV projects, with a focus on technical constraints, permitting procedures, grid connection and economic viability.
The quality of the initial assessments determines the strength of the project. A well-structured analysis helps identify critical issues, opportunities and priorities before the project enters its most demanding phases.
Request an assessment Solar PV for investorsNot every solar PV opportunity automatically becomes a sound project. The site, constraints, expected production, grid connection, permits, layout and economic model all need to be assessed.
The feasibility phase turns an idea, a site or a pipeline into a project that can be clearly understood, assessed and developed.
Preliminary analysis of location, available surfaces, accessibility, technical constraints, interferences and the site’s overall suitability.
Assessment of expected production, possible configurations, the preliminary layout and sizing assumptions.
Identification of the main factors that may affect timing, costs, permits, grid connection and overall project feasibility.
We assess the initial technical conditions to determine which plant configuration is most suitable for the site and the investor’s objectives.
The permitting process can determine the project’s timing and feasibility. An early review of constraints helps avoid pursuing projects with limited development potential.
Grid connection is one of the key elements in the feasibility of a solar PV project and must be considered from the earliest stages.
The feasibility study must help determine whether the project can support the required investment, risks, timing and expected returns.
Feasibility work is not about producing documents for their own sake: it is about reducing uncertainty and guiding development, investment or acquisition decisions.
It helps distinguish projects with genuine potential from those affected by significant technical or permitting issues.
It identifies critical factors before they lead to costs, delays or design decisions that are difficult to reverse.
It helps determine which activities should start immediately, which require further investigation and which should remain on hold.
Site information, available documents, objectives, expected capacity, known constraints and preliminary data.
Assessment of available surfaces, accessibility, technical constraints, interferences and possible configurations.
Permitting framework, grid connection, expected production, preliminary layout and critical issues.
Development of a technical and economic assessment to support the decision on whether to proceed.
Definition of the next activities, priorities and required investigations.
PV feasibility and development activities may concern individual sites, project pipelines, ground-mounted plants, industrial rooftops or assets that have already been identified. The scope is defined according to the project phase and the required level of detail.
We can start with an initial technical, permitting and economic assessment to determine whether the project can be developed.
Request an assessment